Resources · Alpine Enclosure Systems

Resources for planning and specifying your enclosure

Explore product data, drawings and planning resources for Alpine Citadel. Find the information your team needs to compare options, plan access and prepare a project specification.

Open downloads

Product data, CAD details and specifications

Download PDFs, editable specifications and CAD files directly. No form is required. Use the current project drawings and approved submittal for final dimensions and construction requirements.

Open download
AES-CIT-DS-01
PDF

Product data sheet

Explore the Alpine Citadel architectural steel enclosure system: structural steel throughout with no aluminum components, example configurations, clear gate access, custom options, finishes and project engineering.

Download the file
Open download
AES-CIT-EO-01
PDF

Engineering approach

Review the structural system, wind design, load path, posts and anchorage. Project engineering confirms the site loads, dimensions and foundation requirements.

Download the file
Open download
AES-CIT-SS-02
PDF

Example configuration: Single, nominal 12 × 16 ft (TE-S12F)

Compare a nominal 12 × 16 ft single enclosure: 16 ft 8 in × 12 ft 2 in inside with one 12 ft clear gate and room for carts. Any other size is laid out to your site.

Download the file
Open download
AES-CIT-SS-03
PDF

Example configuration: Double, nominal 24 × 12 ft (TE-D24C)

Compare a nominal 24 × 12 ft double enclosure: 26 ft 2 in × 12 ft 2 in inside with two 12 ft clear gates on a shared center post. Any other size is laid out to your site.

Download the file
Open download
AES-CIT-FIN-01
PDF

Finish and color sheet

Select a finish that complements the property. Review galvanized components, exterior powder coating, RAL colors, sample approval and protection for the site exposure.

Download the file
Open download
AES-CIT-SPEC-01
PDF

Guide specification, Section 32 31 19 (PDF)

Coordinate steel enclosures, screen walls and gates in a CSI three-part guide specification. Edit the options and requirements to suit the project drawings and engineering.

Download the file
Open download
AES-CIT-SPEC-01
DOCX

Guide specification, Section 32 31 19 (editable DOCX)

Edit the CSI three-part guide specification for your project manual. Coordinate selected heights, gates, finishes and engineering with the approved project drawings.

Download the file
Open download
AES-CIT-CAD-01
PDF

Typical CAD details (PDF)

Coordinate enclosure plans, elevations, gates, base plates and foundations with seven typical details. Final construction requirements are confirmed by project engineering.

Download the file
Open download
AES-CIT-CAD-01
ZIP

Typical CAD details (DWG and DXF)

Use seven typical CAD details to coordinate enclosure plans, elevations, posts, gates and foundations. Includes editable DWG and DXF files for project drawings.

Download the file
Open download
AES-CIT-CMU-01
PDF

CMU vs steel cost and schedule study

Compare CMU block and structural steel enclosures on installed cost, schedule and trades, using dated public bids and published unit rates for a single and a double enclosure.

Download the file
Open download
AES-NP-01
PDF

National rollout program guide

Establish a consistent enclosure standard across a rollout, with layouts, engineering, kits and releases coordinated by site. Includes program responsibilities and planning inputs.

Download the file
Articles

Articles on requirements, sizing, cost and specification

Planning guidance for architects, contractors and owners: review local requirements, coordinate enclosure dimensions with the hauler, and compare project cost and scope.

Alternate Materials Approval for Steel Dumpster Enclosures

Specification

Alternate materials approval for a steel dumpster enclosure where code says masonry: which clause applies, what to submit, and what to do on a no.

Read the article

BESS and Substation Screening: NFPA 855 and Zoning Rules

Requirements & codes

Battery energy storage screening explained: BESS fence height, opaque screening, NFPA 855 clearances, NEC 7 ft rule and substation zoning, with real examples.

Read the article

Bollard Spacing at Dumpster Enclosures: Placement Guide

Design & sizing

Bollard spacing at dumpster enclosures, from hauler and city standards: how many, how far off the wall, how tall, and what the fire code and ADA add.

Read the article

Car Wash Trash Enclosures and Equipment Screening

Design & sizing

Plan a car wash trash enclosure plus vacuum and equipment screening: what zoning codes ask, how to size and place it, and why a screen is not a noise barrier.

Read the article

Commercial Dumpster Sizes and the Enclosure Each Needs

Design & sizing

Commercial dumpster sizes from 2 to 8 yards with real dimensions from hauler and manufacturer data, and how they set enclosure size, gates and pad.

Read the article

Compactor Enclosures: Sizing, Gates and Clearances

Design & sizing

Compactor enclosure sizing from hauler, city and manufacturer data: equipment footprints, the 12 ft clear gate, truck approach, pad, power and wall height.

Read the article

Data Center Screening: Zoning Rules for Equipment Yards

Requirements & codes

Data center screening rules for generator and chiller yards: what zoning codes require, how to keep equipment airflow, and why a screen isn't a noise barrier.

Read the article

Dumpster and Tire Enclosure Requirements: A US Guide

Requirements & codes

Plan commercial dumpster and tire enclosures around local screening rules, hauler access and fire requirements. Learn what to confirm before specifying.

Read the article

Dumpster Enclosure Details: What to Show on Drawings

Design & sizing

Dumpster enclosure details checklist for architects: plan, gate, base plate and anchor, slab and apron, bollards, drainage, finish and submittal notes.

Read the article

Dumpster Enclosure Dimensions: A Sizing Guide by Container

Design & sizing

Size a dumpster enclosure around the actual containers, clear gate opening and collection access. Review Alpine layouts and the information needed to plan.

Read the article

Dumpster Enclosure Gates: Sizes, Hardware and Sag

Design & sizing

Dumpster enclosure gates explained: how haulers and cities size the clear opening, why gates sag, and which hinges, latches and cane bolts to specify.

Read the article

Dumpster Enclosure Materials: CMU, Steel, Wood & More

Cost & comparisons

Dumpster enclosure materials compared: CMU block, structural steel, wood, vinyl and chain link on code acceptance, foundations, build time and upkeep.

Read the article

Dumpster Enclosure Permit: Do You Need One?

Requirements & codes

Dumpster enclosure permit rules: the IBC 7 ft fence exemption, what triggers a building permit, which approvals come first, and what to submit.

Read the article

Dumpster Enclosure Specification: Which CSI Section to Use

Specification

Dumpster enclosure specification guide: which CSI MasterFormat section to use (32 31 19, 32 35 00 or 05 50 00) and what a steel enclosure spec must cover.

Read the article

Dumpster Enclosures: What They Are, Sizes, Parts and Cost

Design & sizing

Dumpster enclosure guide: what one is, its parts, typical sizes and heights, how it is built and approved, and what it costs, with links to deeper articles.

Read the article

Dumpster Enclosure With Roof: When Cities Require One

Requirements & codes

Dumpster enclosure with roof rules from real city standards: why stormwater drives them, clear heights, drains, permits and fire code, before you draw one.

Read the article

Dumpster Pad Design: Size, Thickness and Apron

Design & sizing

Dumpster pad design: the thickness, size, reinforcement, apron and slope cities and haulers commonly specify, and how the pad carries a steel enclosure.

Read the article

Fence Post Base Plate vs Embedded Post Footings

Engineering

Fence post base plate or embedded post? See how each footing is designed for commercial steel screens, under ACI 318 Chapter 17 and IBC 1807.3.

Read the article

Gas Station Dumpster Enclosures: A C-Store Site Guide

Design & sizing

Plan a gas station dumpster enclosure that clears fuel-site fire rules, fits a compactor and passes masonry-match review, with sourced code examples.

Read the article

Generator and Transformer Screening: Clearances to Hold

Requirements & codes

Generator screen and transformer fence clearances: utility work zones, NEC 110.26 working space and NFPA 37 setbacks, plus a layout checklist for site plans.

Read the article

How Much Does a Dumpster Enclosure Cost? CMU vs Structural Steel

Cost & comparisons

Compare dumpster enclosure costs across materials, gates, engineering, foundations and installation. Understand Alpine budget ranges and project exclusions.

Read the article

Mechanical Equipment Screen Rules: What Zoning Codes Require

Requirements & codes

What zoning codes require of a mechanical equipment screen: height, opacity, materials and planting, with real ordinance examples and a site plan checklist.

Read the article

Outdoor Storage Screening Requirements for Commercial Yards

Requirements & codes

Outdoor storage screening requirements from real zoning codes: fence height, opacity, stack limits and when a commercial privacy fence qualifies.

Read the article

Outdoor Tire Storage Requirements: IFC Chapter 34 Explained

Requirements & codes

Outdoor tire storage requirements in plain language: IFC Chapter 34 pile limits, clearances, fire access, and 6 ft fence and 20 ft gate rules for tire yards.

Read the article

Powder Coating vs Galvanizing for Steel Enclosures

Cost & comparisons

Powder coating vs galvanizing for outdoor steel: how each protects, hot-dip vs electro-galvanized zinc, duplex systems, and what to write in the spec.

Read the article

Restaurant Dumpster Enclosures for Drive-Thru and QSR Sites

Design & sizing

Plan a restaurant dumpster enclosure for a drive-thru coffee or QSR site: trash, recycling, organics and the grease bin, on a small pad and a fast schedule.

Read the article

Scrap Tire Storage at a Tire Shop: Enclosure Checklist

Design & sizing

Scrap tire storage at a tire shop: an eight-point enclosure checklist covering tire counts, state limits, keeping tires dry, screening, setbacks and gates.

Read the article

Screen Wall Wind Load: How ASCE 7-22 Sets It

Engineering

Screen wall wind load under ASCE 7-22 for engineers and architects: velocity pressure, Cf, load cases, porosity, and what drives post and anchor design.

Read the article

Steel vs Aluminum Fence: A Commercial Specifier's Guide

Cost & comparisons

Steel vs aluminum fence for commercial sites: stiffness, strength, corrosion, finish standards and gates compared, with engineering sources for specifiers.

Read the article

Trash and Used-Oil Enclosures for Quick-Lube Sites

Design & sizing

Plan a quick-lube trash enclosure that also screens used-oil drums, filters and tires: what 40 CFR 279, fire and zoning codes ask, and how to lay out bays.

Read the article

Trash Enclosure Design Ideas for Commercial Properties

Design & sizing

Trash enclosure design ideas for commercial and multifamily sites: screening styles, colors, gates, roofs and hauler access that pass design review.

Read the article

Trash Enclosure Standard for a Multi-Site Rollout

Specification

Build a trash enclosure standard for a multi-site rollout: a base detail plus pre-engineered options, so each city's rules select an option, not a redesign.

Read the article