Explore product data, drawings and planning resources for Alpine Citadel. Find the information your team needs to compare options, plan access and prepare a project specification.
Download PDFs, editable specifications and CAD files directly. No form is required. Use the current project drawings and approved submittal for final dimensions and construction requirements.
Explore the Alpine Citadel architectural steel enclosure system: structural steel throughout with no aluminum components, example configurations, clear gate access, custom options, finishes and project engineering.
Download the fileReview the structural system, wind design, load path, posts and anchorage. Project engineering confirms the site loads, dimensions and foundation requirements.
Download the fileCompare a nominal 12 × 16 ft single enclosure: 16 ft 8 in × 12 ft 2 in inside with one 12 ft clear gate and room for carts. Any other size is laid out to your site.
Download the fileCompare a nominal 24 × 12 ft double enclosure: 26 ft 2 in × 12 ft 2 in inside with two 12 ft clear gates on a shared center post. Any other size is laid out to your site.
Download the fileSelect a finish that complements the property. Review galvanized components, exterior powder coating, RAL colors, sample approval and protection for the site exposure.
Download the fileCoordinate steel enclosures, screen walls and gates in a CSI three-part guide specification. Edit the options and requirements to suit the project drawings and engineering.
Download the fileEdit the CSI three-part guide specification for your project manual. Coordinate selected heights, gates, finishes and engineering with the approved project drawings.
Download the fileCoordinate enclosure plans, elevations, gates, base plates and foundations with seven typical details. Final construction requirements are confirmed by project engineering.
Download the fileUse seven typical CAD details to coordinate enclosure plans, elevations, posts, gates and foundations. Includes editable DWG and DXF files for project drawings.
Download the fileCompare CMU block and structural steel enclosures on installed cost, schedule and trades, using dated public bids and published unit rates for a single and a double enclosure.
Download the fileEstablish a consistent enclosure standard across a rollout, with layouts, engineering, kits and releases coordinated by site. Includes program responsibilities and planning inputs.
Download the filePlanning guidance for architects, contractors and owners: review local requirements, coordinate enclosure dimensions with the hauler, and compare project cost and scope.
Alternate materials approval for a steel dumpster enclosure where code says masonry: which clause applies, what to submit, and what to do on a no.
Read the articleBattery energy storage screening explained: BESS fence height, opaque screening, NFPA 855 clearances, NEC 7 ft rule and substation zoning, with real examples.
Read the articleBollard spacing at dumpster enclosures, from hauler and city standards: how many, how far off the wall, how tall, and what the fire code and ADA add.
Read the articlePlan a car wash trash enclosure plus vacuum and equipment screening: what zoning codes ask, how to size and place it, and why a screen is not a noise barrier.
Read the articleCommercial dumpster sizes from 2 to 8 yards with real dimensions from hauler and manufacturer data, and how they set enclosure size, gates and pad.
Read the articleCompactor enclosure sizing from hauler, city and manufacturer data: equipment footprints, the 12 ft clear gate, truck approach, pad, power and wall height.
Read the articleData center screening rules for generator and chiller yards: what zoning codes require, how to keep equipment airflow, and why a screen isn't a noise barrier.
Read the articlePlan commercial dumpster and tire enclosures around local screening rules, hauler access and fire requirements. Learn what to confirm before specifying.
Read the articleDumpster enclosure details checklist for architects: plan, gate, base plate and anchor, slab and apron, bollards, drainage, finish and submittal notes.
Read the articleSize a dumpster enclosure around the actual containers, clear gate opening and collection access. Review Alpine layouts and the information needed to plan.
Read the articleDumpster enclosure gates explained: how haulers and cities size the clear opening, why gates sag, and which hinges, latches and cane bolts to specify.
Read the articleDumpster enclosure materials compared: CMU block, structural steel, wood, vinyl and chain link on code acceptance, foundations, build time and upkeep.
Read the articleDumpster enclosure permit rules: the IBC 7 ft fence exemption, what triggers a building permit, which approvals come first, and what to submit.
Read the articleDumpster enclosure specification guide: which CSI MasterFormat section to use (32 31 19, 32 35 00 or 05 50 00) and what a steel enclosure spec must cover.
Read the articleDumpster enclosure guide: what one is, its parts, typical sizes and heights, how it is built and approved, and what it costs, with links to deeper articles.
Read the articleDumpster enclosure with roof rules from real city standards: why stormwater drives them, clear heights, drains, permits and fire code, before you draw one.
Read the articleDumpster pad design: the thickness, size, reinforcement, apron and slope cities and haulers commonly specify, and how the pad carries a steel enclosure.
Read the articleFence post base plate or embedded post? See how each footing is designed for commercial steel screens, under ACI 318 Chapter 17 and IBC 1807.3.
Read the articlePlan a gas station dumpster enclosure that clears fuel-site fire rules, fits a compactor and passes masonry-match review, with sourced code examples.
Read the articleGenerator screen and transformer fence clearances: utility work zones, NEC 110.26 working space and NFPA 37 setbacks, plus a layout checklist for site plans.
Read the articleCompare dumpster enclosure costs across materials, gates, engineering, foundations and installation. Understand Alpine budget ranges and project exclusions.
Read the articleWhat zoning codes require of a mechanical equipment screen: height, opacity, materials and planting, with real ordinance examples and a site plan checklist.
Read the articleOutdoor storage screening requirements from real zoning codes: fence height, opacity, stack limits and when a commercial privacy fence qualifies.
Read the articleOutdoor tire storage requirements in plain language: IFC Chapter 34 pile limits, clearances, fire access, and 6 ft fence and 20 ft gate rules for tire yards.
Read the articlePowder coating vs galvanizing for outdoor steel: how each protects, hot-dip vs electro-galvanized zinc, duplex systems, and what to write in the spec.
Read the articlePlan a restaurant dumpster enclosure for a drive-thru coffee or QSR site: trash, recycling, organics and the grease bin, on a small pad and a fast schedule.
Read the articleScrap tire storage at a tire shop: an eight-point enclosure checklist covering tire counts, state limits, keeping tires dry, screening, setbacks and gates.
Read the articleScreen wall wind load under ASCE 7-22 for engineers and architects: velocity pressure, Cf, load cases, porosity, and what drives post and anchor design.
Read the articleSteel vs aluminum fence for commercial sites: stiffness, strength, corrosion, finish standards and gates compared, with engineering sources for specifiers.
Read the articlePlan a quick-lube trash enclosure that also screens used-oil drums, filters and tires: what 40 CFR 279, fire and zoning codes ask, and how to lay out bays.
Read the articleTrash enclosure design ideas for commercial and multifamily sites: screening styles, colors, gates, roofs and hauler access that pass design review.
Read the articleBuild a trash enclosure standard for a multi-site rollout: a base detail plus pre-engineered options, so each city's rules select an option, not a redesign.
Read the article